Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Deutsch |Pусский |
| No.13696353
![](http://i.b2b168.com/e/tag_pthy.gif)
- Product Categories
- Friendly Links
- home > Supply > Two open downhole tool and completion pressure test car wellhead pressure test pump test device
Information Name: | Two open downhole tool and completion pressure test car wellhead pressure test pump test device |
Published: | 2015-04-13 |
Validity: | 30 |
Specifications: | QY |
Quantity: | 100.00 |
Price Description: | |
Detailed Product Description: | 1. The subject of the product scope and conditions: 1.1 This product is used to open and natural gas wellhead completion Second stress test; 1.2 was tested single well depth 3600m, casing diameter 139.7mm; 1.3 maximum test pressure is 40MPa... Specific test pressure parameters are 19.4,30MPa. 2. Product features: 2.1.1 System maximum test pressure: 40MPa; system control power: 30KW; 2.1.2 system with manual and automatic operation of two control modes; 2.1.3 manual operation with digital display features timely pressure, the state Under the data acquisition, export, storage function effectively; 2.1.4 microcomputer automatic operation with digital display also shows the DRO timely pressure function; 2.1.5 segmented pressure test function; 2.1.6 boost valves, container unloading valve respectively, for manual and automatic operation of two operation modes; 2.1.7 humane system parameters, the parameters output full Chinese, the picture is simple and easy to operate; 2.1.8 automatic boost function: automatic boost control system; 2.1.9 Automatic packing function: automatically stop after the boost pressure reaches the automatic packing, until it reaches the set dwell time; 2.1.10 automatic unloading function: pump end automatic unloading, automatic unloading test wellhead pressure, overpressure and failure automatic unloading, which overpressure automatic unloading function selectable; 2.1.11 packing stop function: select whether to shut down the process of packing to maximize energy-saving operation; 2.1.12 test parameter record: You can test the parameters of each group Save and quickly called when the last test; 2.1.13 revision intelligent system parameters Function: adaptation of the pressure transmitter set range, deviation and other parameters, and may amend actual testing process pressure deviation; 2.1.14 data report printing and storage: You can print test data curve or report, you can set the time interval for printing parameters, and test data storage, easy to query calls; 2.1.15 system with automatic triple overpressure protection, overpressure automatic alarm function ; 2.1.16 system with "emergency stop" operation function; 2.1.17 fault diagnosis function: alarm and shutdown based on failure to make prompt, easy maintenance; 2.1.18 electrical control console using shock measures, able to adapt to field operations ; 2.1.19 camping activity room with insulation function, with the winter construction conditions. Specific dimensions: length x width x height: 4600x1950x2000mm, camping room with a desk fan heater, heater switch control artificial heating. 3. The entire system wellhead pressure testing device main configurations: (a) pressure test pump model and related parameters: Model: 3DSY2400 / 40 technical parameters and configuration: the maximum working pressure 40Mpa, flow 2400L / h, power 30Kw, ordinary motor drive, high-pressure pump with booster pump and filtration system, with stainless steel inner tank 0.8m3 (including road and out of water, maintenance of valves and drain valve, etc.). (B) the main wellhead pressure test system configuration: No. Name Type Unit Quantity Remarks 1 platform PCS40-30 sets a vehicle-mounted two 14-inch business notebook Lenovo Taiwan 13 system control software suite 14 Cape Air pressure test flight control system core P set of 15 black and white laser printer LBP-2900 (A4) sets a Canon 6 30Kw electric control system sets a solenoid Chint 7 dedicated cable RVV-3 根 25 m / root 8 shielded cable RVV root pressure transmitter 15 m 9 30Kw root control cable 15 m Notes: The printer can be equipped with; (c) the annex to the main wellhead pressure test system configuration: No. Name Type Unit Quantity Remarks 1 Hip-way valve sleeve 1 10000Psi 2 Hip manual unloading valve sleeve 1 10000Psi 3 relief YLF 1 10000Psi 4 sets of electric boost pump side valve cover 1 0-50 MPa 5 container electric unloading valve cover 1 0-50 MPa 6 electric shutoff valve cover 1 0-50 MPa 7 YTNX pressure gauge only 10 -60MPa 8 Pressure Transmitters DJI1300 only 1 0-50MPa 9 high-pressure hose 18 m, diameter 13mm root 2 60MPa 10 wellhead transition joints 2-inch, 2.5-inch pieces 4 70MPa 11 3/4 inch quick connector sleeve 4 50MPa 12 Unloading front-end filter valve imported 13 sets a three-phase four-core cable 100 meters optional flange 14 completions pressure test sets a matching note: 1. Second, open and completions finished pressure test has finished, due to impurities in the well, silt, sand, etc. in the instant impact unloading relief valve, causing internal damage caused by leakage affects body packing effects. Now the front unloading valve to increase the protection of a high-precision filter unloading valves, prolong life and save money on the user wearing parts. 2. The test pump inlet pipe to increase the injection pump and a filter device to prevent debris from entering the pump out of the impact test pump valve, electric pump end boost valve, check valve life. While avoiding the test pump inlet valve self-absorption process caused no water problems. 4. wellhead pressure testing device acceptance conditions and technical specifications: packing accuracy: natural gas wellhead pressure in the second to open the testing process has been under pressure after the test piece no leakage, no obvious distortion test pressure 19.4Mpa, dwell time 10 minutes, the pressure drop of no more than 0.7Mpa; the completion stress test process without leakage after when the wellhead pressure, while no significant deformation, test pressure 30Mpa, dwell time of 30 minutes, the pressure drop of no more than 0.5Mpa. 5. The demand side in the commissioning phase should have the technical conditions: 5.1 need to be tested provided by the well, the test pressure must not exceed 40Mpa. 5.2 the demand side in the commissioning process should provide clean water quality, debugging tools, three-phase four-wire power supply (380V ± 10), 80-100 m phase four core cable and other supplies, lifting, labor (including electrician) and related conditions to facilitate debugging. 6. commissioning and technical training: 6.1 Free commissioning and training: The system is free initial commissioning and commissioning, while free technical training. After commissioning the demand side with the conditions, the phone call from the demand side for side-site commissioning time, commissioning personnel arrived at the scene, if the issues demand-side reasons, can not be completed within seven working days commissioning, commissioning delays during travel borne by the demand side ; When you do not have to debug condition, to be subject to agreed commissioning time, demand-side bear this commissioning staff travel, the next debug free. "Three Guarantees" during debugging products because the system itself has hardware and software technical problems of failure, the supplier shall be free to re-commissioning. Debugging time for ten working days from the date of completion of the field arrive. 6.2 Paid debugging: 6.2.1 improper user operating system software, hardware damage should be paid to re-commissioning. Specific costs of bilateral friendly consultations. 6.2.2 The conditions are not met by the user to debug lead supplier arrives at the site can not be commissioning and commissioning, the next re-commissioning should pay. Specific costs of bilateral friendly consultations. 7. Software information: (1) wellhead pressure test system operation manual, certificate, packing list. (2) electrical wiring diagram, electrical components list. (3) providing a set of control system software. 8. wellhead pressure test product service systems: (1) wellhead pressure test the system after the completion of the construction site at the demand side, acceptance of the system is responsible for commissioning and technical training to users of the operator. "Three guarantees" (2) hardware system for 12 months (calculated from the equipment installation and commissioning date of eligibility). After the "three guarantees", such as hardware configuration system fails, the supplier shall be able to provide timely and effective service work, the control software system fails, the supplier shall, according to the actual situation in a timely and effective manner processing solutions. (3) Maintenance materials and related expenses "three guarantees" system during the improper operation caused by the failure occurs shall be borne by the demand side, the supplier to provide timely and effective service; "three guarantees" period due to system software and hardware itself fails and maintenance materials produced related costs borne by the supplier. Costs incurred after the "three guarantees" by the two sides negotiated settlement. (4) The supplier shall provide for the demand side system upgrade technical support issues involving the two sides negotiated settlement. (5) This product is developed by the supplier, and its intellectual property rights belonging to supply-side, demand-side can be used only on the corresponding configuration of the device control, shall not be used for other purposes. |
Admin>>>
You are the 8215 visitor
Copyright © GuangDong ICP No. 10089450, Cape Air Jiangsu Machinery Manufacturing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 8215 visitor
Copyright © GuangDong ICP No. 10089450, Cape Air Jiangsu Machinery Manufacturing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility